Please use this identifier to cite or link to this item: http://hdl.handle.net/11144/3744
Title: An option pricing approach to optimal bidding in construction projects
Authors: Ribeiro, João A.
Pereira, Paulo J.
Brandão, Elisio M.
Keywords: pricing approach
construction projects
Issue Date: Jul-2017
Publisher: Wiley Online Library
Abstract: Reaching an optimal mark‐up value in the context of construction projects' bidding competitions has been a research topic for more than 40 years. This paper aims to contribute to this debate by applying a real options approach. The proposed model has a pure theoretical nature and is based on a maximization problem, whose outcome is the optimal price, that is, the price that should be included in the bid proposal. The model is later extended to accommodate the existence of penalty costs if the selected bidder refuses to enter into contract. Results reached using a numerical example demonstrate that the optimal price is higher when penalty costs are considered.
Peer Reviewed: yes
URI: http://hdl.handle.net/11144/3744
metadata.dc.identifier.doi: https://doi.org/10.1002/mde.2878
ISSN: 0143-6570
1099-1468
Publisher Version: https://onlinelibrary.wiley.com/doi/abs/10.1002/mde.2878
Appears in Collections:DCEE - Artigos/Papers

Files in This Item:
File Description SizeFormat 
An option pricing approach to optimal bidding in construction projects.pdf84,33 kBAdobe PDFThumbnail
View/Open


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpaceOrkut
Formato BibTex mendeley Endnote Logotipo do DeGóis Logotipo do Orcid 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.